Process

A 12-step automated
production process.

From incoming IQC inspection to final packing, we strictly follow ISO-standard procedures.
01

IQC & RoHS Check

Incoming material inspection and hazardous-substance (RoHS) testing

02

Cutting & Peeling

Wire cutting and stripping to drawing specifications

03

Auto Crimping

Automatic single/double-end terminal crimping

04

Visual Inspection

Visual inspection for crimp height, bending, and deformation

05

Tensile Force Test

Tensile force measurement at the crimp point

06

Manual Crimping

Manual crimping and dedicated flag-terminal fastening

07

Sub Assembly

Sub-assembly at dedicated work stations

08

Main Assembly

Main assembly along the conveyor line

09

Terminal Section Check

Microscopic cross-section analysis of terminals

10

Circuit Testing

100% electrical testing for continuity, miswiring, and shorts

11

QR Print & Attach

In-line QR label printing and attachment for traceability

12

Packing & Final QA

Trolley/box packing and final shipping inspection

Have a drawing?
Get a quote first.

Send us a basic drawing and we'll give you an estimated price and lead time.

Email Us

Send us your drawing by email and we'll reply within 2 business days.